• 0

Project Consultancy, Reports & Profiles

Best Business Opportunities in Madhya Pradesh - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship


Why start your own Business?

Entrepreneurs frequently start their own businesses as a result of their dreams and passions. It might be tough to find the drive to put out your best efforts when you work for someone else. 

Entrepreneurs get the freedom to set their schedules. You will be able to spend more time with your family and friends once the company is established and you have hired people to do the majority of the critical tasks.  

You have the potential to manipulate your surroundings. By creating new job opportunities, you may create employment and strengthen the economy. There is no limit to how profitable your own company will be if you work hard and stay focused. Your established business can be passed down to your kids or grandsons.

 

What makes Madhya Pradesh an excellent place to start a Business?

 

Infrastructure and industries in Madhya Pradesh; 

The state, located in central India and is known as the “heart of India,” has benefited from substantial infrastructure projects, with both North-South and East-West corridors passing through it. 

Madhya Pradesh has an excellent infrastructure to assist industrial development. There are 550 trains crossing the state every day, a 5,000-kilometer National Highway network, five commercial airports with 100+ flights, and six inland container depots (ICDs). The state owns an oil refinery at Bina with an annual capacity of 6 MMT. The state’s installed power capacity is about 23,400 MW, with renewable energy sources accounting for 35% of that. 

The state is a significant producer of horticulture crops and provides attractive opportunities for the food processing industry. There are many business options available in Madhya Pradesh, including textile manufacturing, automobile manufacturing, cement production, food production, soya farming, and agricultural equipment manufacturing.

 

Railways in Madhya Pradesh; 

Uttar Pradesh (northeast), Rajasthan (northwest), Maharashtra (south), Gujarat (west) and Chhattisgarh (southeast) surround Madhya Pradesh. With a total of 20 important junctions, Madhya Pradesh has excellent rail connectivity. Several criss-cross rail networks operate through the state. The West Central Railway Zone of Indian Railways is headquartered in Jabalpur Junction. Every day, more than 455 trains pass through Madhya Pradesh. Bhopal, the state capital, has 220 trains passing through it. The North-South and East-West corridors go across the state of Madhya Pradesh.

 

Airports in Madhya Pradesh;

Madhya Pradesh is easily accessible from all parts of India. In Madhya Pradesh, there are several airports: Raja Bhoj International Airport (Bhopal Airport), Devi Ahilyabai Holkar Airport (Indore Airport) (International), Rajmata Vijaya Raje Scindia Air Terminal (Gwalior Airport) (Domestic), Dumna Airport (Jabalpur Airport) (Domestic), and Khajuraho Airport (Domestic).

 

Road connectivity in Madhya Pradesh; 

Madhya Pradesh has a 160,000-kilometer road network. Thirty-eight national highways cross the state with a total length of 7,854 kilometres. The length of state roadways is around 11,000 kilometres. The Narmada Expressway is a proposed 8-lane expressway in Madhya Pradesh that will connect Amarkantak in the state’s eastern end to the state’s western end along the Narmada River through Dindori, Shahpura, Jabalpur, and Alirajpur. Gujarat and Chhattisgarh would be connected by 1,300 km of roadways.

 

Agriculture in Madhya Pradesh; 

The Chambal valley, the Malwa Plateau, and the Rewa Plateau are the main farmed areas. Another fertile area is the Narmada valley, which is covered in river-borne alluvium. Rice, wheat, sorghum (jowar), corn (maise), pulses (legumes such as peas, beans, or lentils), and peanuts are the most important crops (groundnuts). Rice is farmed mostly in the east, where there is greater rainfall, although wheat and sorghum are more important in western Madhya Pradesh. In India, the state produces the most soybeans. Linseed, sesame, sugarcane, cotton, and inferior millets are other crops grown in hilly terrain.

In the western district of Mandsaur, near Rajasthan, along with the southwestern district of Khandwa [East Nimar]) the state is a major producer of opium and marijuana.

 

Madhya Pradesh’s Mineral Resources; 

Manganese is the most abundant mineral in the state, along with Glass sand, dolomite, and rock phosphate. It is India’s largest cement producer, accounting for 14% of its total cement production. Malanjkhand, Balaghat, is home to India’s largest open-cast copper mine. Singrauli coalfield has Asia’s thickest coal seam (135 mm). The state is India’s only diamond-producing state and a key producer of coal, limestone, copper, diaspora, and pyrophyllite.

 

Business-Friendly Policies in Madhya Pradesh; 

The state is situated in a key geographic location and is rich in natural resources. One of Madhya Pradesh’s focus areas for economic growth is increasing investments in industrial development. The state is quickly expanding and provides numerous business potential in a variety of industries. Madhya Pradesh’s industry-oriented transparent policies and hassle-free investment procedures aim to make the state a global investment hub. 

A huge land bank, a 24x7 power supply, and an improved law and order situation distinguish Madhya Pradesh as an investment-friendly state. The state has implemented a “single table” model to expedite project approvals and clear applications. The state is ranked in the top 10 states for business ease. There is a conducive climate for investors to visit and invest.

 

What are the steps for Starting a Business in Madhya Pradesh?

 

Decide on a Business Structure; 

Conducting research and reflecting on the following questions is the first step in beginning your business: 

What are my goals and objectives?

Do I wish to hire employees or operate as a sole proprietor?

What are my financial needs, and how much funds do I have on hand? 

This data will assist you in the construction of your business structure. Each company has its own set of needs, and legal organisations are not a one-size-fits-all solution.

 

2. Develop a Business Plan; 

Entrepreneurs who are planning to start a business usually ignore the importance of a business plan. You should have a sound business strategy even if your venture is self-funded. A business plan will essentially describe how much money you’ll need to invest upfront, how much money you’ll need to spend each month or quarter, and when you’ll, you’ll be able to start making money.

 

List of options to consider while forming a business in Madhya Pradesh; 

Limited Liability Company (LLC)

A sole proprietorship 

Partnership Deed 

 

Establishing a Business in Madhya Pradesh requires the following documents; 

Among the crucial steps in starting a business in Madhya Pradesh is to ensure you have all relevant permits and licences. Any paperwork error can negate your efforts. 

When it comes to starting a business, there are several legal regulations and documents that must be completed. Some of those  documents;

 

Digital Signature Certificate (DSC)

Director Identification Number (DIN)

Registration on the MCA Portal

Certificate of Incorporation

 

1. Create a strategy for Ensuring Compliance; 

Even if you own a small business, you are bound by some laws and regulations that govern larger corporations. Regulations controlling advertising, marketing, financing, intellectual property, and consumer privacy are just a few examples. Businesses with employees may be subject to additional state and local requirements in Madhya Pradesh.

 

2. Get Commercial Insurance ; 

Any legal or financial concerns that threaten your business will have an immediate impact on you. It’s crucial to protect your company against liability damages, not only because many clients want it, but also to protect yourself and your future stability. Naturally, the insurance that is right for your company will differ greatly, depending on your industry, the size of your company, and the kind of clients you work with, among other factors.

 

3. Register the name of Your Business; 

The name of your company is frequently used as a label. Prospective customers build an impression of a company based on its name. The name should be easy to recall and understand. Make sure your company’s name is recognisable and describes the services you offer. It’s important to remember that your company name should not already be in use. You must register your business name and, if necessary, copyright it to ensure that no one else uses it.

 

4. Build an effective Business Policy; 

An enterprise’s success will be aided by the development of an efficient business policy. It is something that both employees and management benefit from. It makes it simple to achieve the required planned growth.

 

 

AD_20Art21

Reasons for buying our reports:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, market potential of the product and reasons for investing in the product

• This report provides vital information on the product like its characteristics and segmentation

• This report helps you market and place the product correctly by identifying the target customer group of the product 

• This report helps you understand the viability of the project by disclosing details like machinery required, project costs and snapshot of other project financials

• The report provides a glimpse of government regulations applicable on the industry

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decisions.

 

Our Approach:

• Our research reports broadly cover Indian markets, present analysis, outlook and forecast for a period of five years.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players

• We use reliable sources of information and databases. And information from such sources is processed by us and included in the report



We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Now Is The Time To Take Control Of Your Future And Start A Business
Now Is The Time To Take Control Of Your Future And Start A Business

 

Starting a busine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production of Potato Chips And  Extruded Snack Food  (Kurkure Type)
Start Production of Potato Chips And Extruded Snack Food (Kurkure Type)

Potato Chips a... Read More

Capacity :
Potato Chips: 150,000 Kgs Per Annum Kurkure Type Snacks: 150,000 Kgs Per Annum
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
71.00 %
TCI :
0.00 Lakhs
Cost of Project :
121.00Lakhs
Add To Inquiry Basket
Setup Cashew Nut Processing Plant
Setup Cashew Nut Processing Plant

Cashew nut pro... Read More

Capacity :
Cashew Nut Processing: 4,794 Kgs Per Day
Plant and Machinery cost:
600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
76.00 %
TCI :
0.00 Lakhs
Cost of Project :
1100.00Lakhs
Add To Inquiry Basket
Start a Business of Particle Board  From Rice Husk
Start a Business of Particle Board From Rice Husk

Particle board, also known ... Read More

Capacity :
Particle Board (Size 4ftx8ftx16 inch.): 150,000 Nos. Per Annum
Plant and Machinery cost:
200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
1100.00Lakhs
Add To Inquiry Basket
A Business Plan for Wood Plastic Composite (WPC)
A Business Plan for Wood Plastic Composite (WPC)

 

Wood... Read More

Capacity :
Wood Plastic Composite (WPC): 10 Million Sq.Ft. per annum
Plant and Machinery cost:
406.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
790.00Lakhs
Add To Inquiry Basket
Start a Production Of Soda Ash  By Solvay Process
Start a Production Of Soda Ash By Solvay Process

Soda ash, or sodium carbonate, is a white, powdery chemical commonly used in the prod... Read More

Capacity :
Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl): 200,000 MT Per Annum
Plant and Machinery cost:
105000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
14.00%
Break Even Point (BEP):
43.00 %
TCI :
0.00 Lakhs
Cost of Project :
1265.00Lakhs
Add To Inquiry Basket
Setup Plant OF Hot Dip Galvanizing
Setup Plant OF Hot Dip Galvanizing

 

Hot ... Read More

Capacity :
All Types of MS Structure 120 MT per day
Plant and Machinery cost:
619.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
2647.00Lakhs
Add To Inquiry Basket
A Business Plan for Potato Powder, Starch & Flakes
A Business Plan for Potato Powder, Starch & Flakes

Potato Powder, Starch & Flakes are a range of products derived from the tuber of ... Read More

Capacity :
-
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start a Business of Lithium Ion Battery (Battery Assembly)
Start a Business of Lithium Ion Battery (Battery Assembly)

A lithium-ion or Li-ion battery is a type of rec... Read More

Capacity :
Lithium-Ion Battery 60,000 Nos per Annum
Plant and Machinery cost:
172.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
812.00Lakhs
Add To Inquiry Basket
Best Industry Business Plan Is Zeolite 4a! (Detergent Grade)
Best Industry Business Plan Is Zeolite 4a! (Detergent Grade)

The Product:... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Startup Most Growing and Demanding industry Business plant of Fiberglass Transparent LPG Cylinders
Startup Most Growing and Demanding industry Business plant of Fiberglass Transparent LPG Cylinders

Product: Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Manufacturing of PP Woven Fabric
Start Manufacturing of PP Woven Fabric

Polypropylene, which is also known as PP for short name, is one kind of thermoplastic... Read More

Capacity :
PP Woven Fabric 12 MT per day
Plant and Machinery cost:
943.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1637.00Lakhs
Add To Inquiry Basket
Business Opportunities in Production of Dicyandiamide  (DCDA)
Business Opportunities in Production of Dicyandiamide (DCDA)

 

Dicyandiamide is ... Read More

Capacity :
Dicyandiamide (DCDA) 5 MT Per Day
Plant and Machinery cost:
45.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
270.00Lakhs
Add To Inquiry Basket
Emerging Business of Shrimp Processing  (EOU)
Emerging Business of Shrimp Processing (EOU)

 

Shrimp are decapo... Read More

Capacity :
Shrimp Processing (per Pack 1 Kg Size) 19,500 Kgs Per Day
Plant and Machinery cost:
202.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
1465.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Business of IV Fluids (BFS Technology)
Investment Opportunities in Business of IV Fluids (BFS Technology)

 

Intravenous fluid... Read More

Capacity :
IV Fluids (500 ml Size Bottle) 50,000 Bottles per day
Plant and Machinery cost:
3449.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
20.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
4089.00Lakhs
Add To Inquiry Basket
Start Business of A-2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)
Start Business of A-2 Cow Milk Processing (Milk, Butter, Ghee & Paneer)

Milk is the most important source of protein and is consumed by people all over the w... Read More

Capacity :
A-2 Milk (1 Ltr Tetra Pack) 2,250 Kgs per day Butter (100 & 500 gms Pack) 46 Kgs per day Paneer (4 P
Plant and Machinery cost:
19.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
484.00Lakhs
Add To Inquiry Basket
Start Production of  Paracetamol (BP,IP,USP Grade)
Start Production of Paracetamol (BP,IP,USP Grade)

Read More

Capacity :
Paracetamol Powder (IP/BP Grade 50 MT Per Day Acetic Acid (31% Conc.) By Product 72 MT Per Day
Plant and Machinery cost:
962.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
2887.00Lakhs
Add To Inquiry Basket
Industrial and Pharmaceutical Grade Starch from Cassava, Maize and Tacca Roots
Industrial and Pharmaceutical Grade Starch from Cassava, Maize and Tacca Roots

 

Cassava, sorghum,... Read More

Capacity :
Industrial Grade Starch 37.5 MT Per Day Pharmaceutical Grade Starch 12.5 MT Per Day
Plant and Machinery cost:
257.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
76.00 %
TCI :
0.00 Lakhs
Cost of Project :
1255.00Lakhs
Add To Inquiry Basket
Production of  Copper Wire Drawing & Enamelling
Production of Copper Wire Drawing & Enamelling

 

Copper is one of ... Read More

Capacity :
Copper Wire (0.914 to 0.376 mm) 350 Kgs per day Enamelled Copper Wire (0.914 to 0.376 mm) 350 Kgs pe
Plant and Machinery cost:
432.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
1233.00Lakhs
Add To Inquiry Basket
Profitable Industry of Bamboo Sticks
Profitable Industry of Bamboo Sticks

 

Bamboo is a tribe... Read More

Capacity :
Bamboo Sticks 4 MT Per Day
Plant and Machinery cost:
443.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
791.00Lakhs
Add To Inquiry Basket
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector

 

Allo... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)

Milk... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry

Bamboo toothbrushes Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Profitable Business Industry of  Electric Motors
Profitable Business Industry of Electric Motors

 

An e... Read More

Capacity :
5 KW Three Phase Induction Motors120 Nos Per Day 10 KW Three Phase Induction Motors 20 Nos Per Day 1
Plant and Machinery cost:
467.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
3949.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Carbonated Health Drinks
Investment Opportunities in Carbonated Health Drinks

 

Carb... Read More

Capacity :
Carbonated Health Drinks Size 250 ml 8,000 Packs Per Day Carbonated Health Drinks Size 330 ml 4,000
Plant and Machinery cost:
49.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
299.00Lakhs
Add To Inquiry Basket
Business Industry of  Stone Plastic Composite (SPC) Flooring Tiles
Business Industry of Stone Plastic Composite (SPC) Flooring Tiles

 

Stone plastic com... Read More

Capacity :
Stone Plastic Composite (SPC) Flooring Tiles 3,000 Sq,mtr Per Day
Plant and Machinery cost:
408.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
1011.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Waste Lubricating Oil  Recycling Plant
Investment Opportunities in Waste Lubricating Oil Recycling Plant

 

Waste oil is made... Read More

Capacity :
Used Lubricating Oil 20,000 Ltrs per day Spent Clay as by product 2,105 Ltrs per day
Plant and Machinery cost:
127.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
753.00Lakhs
Add To Inquiry Basket
Automated Vehicle Scrapping  and Recycling Unit
Automated Vehicle Scrapping and Recycling Unit

 

The disassembly o... Read More

Capacity :
1000 Vehicles per Month
Plant and Machinery cost:
497.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
2090.00Lakhs
Add To Inquiry Basket
Azodicarbonamide Using Urea and Hydrazine Hydrate
Azodicarbonamide Using Urea and Hydrazine Hydrate

 

The chemical comp... Read More

Capacity :
Azodicarbonamide Powder 40 MT Per Day Ammonia 10.6 MT Per Day Hydrochloric Acid (38% Conc.) 20.1 MT
Plant and Machinery cost:
1951.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
3109.00Lakhs
Add To Inquiry Basket
Rising Demand of  Rice Husk based Biodegradable Cutlery
Rising Demand of Rice Husk based Biodegradable Cutlery

 

People have been ... Read More

Capacity :
Biodegradable Cutlery (Per Set 6 Pcs. Flatware) 1,852 Sets per day
Plant and Machinery cost:
29.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
135.00Lakhs
Add To Inquiry Basket
Profitable Business of Magnesium Sulphate
Profitable Business of Magnesium Sulphate

Magnesium sulphate is an inorganic salt with the formula MgSO4 Read More

Capacity :
72 MT Per Day
Plant and Machinery cost:
256.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
900.00Lakhs
Add To Inquiry Basket
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)

Grain processing, as exempli... Read More

Capacity :
Moong Dal 1 MT Per Day Masur Dal 1 MT Per Day Toor Dal 1.5 MT Per Day Chana Dal 1 MT Per Day Kabul
Plant and Machinery cost:
63.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
165.00Lakhs
Add To Inquiry Basket
Setting up a Multispeciality Hospital (200 Bedded)
Setting up a Multispeciality Hospital (200 Bedded)

A hospital is a health care institution providing patient treatment with specialized m... Read More

Capacity :
200 Bedded Hospital
Plant and Machinery cost:
14000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
21248.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Aluminium Ingots from Aluminium Scrap
Start Manufacturing of Aluminium Ingots from Aluminium Scrap

Aluminum, is a light weight,... Read More

Capacity :
Aluminium Alloy Ingots14 MT per day Aluminium Scrap 0.23 MT per day
Plant and Machinery cost:
700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
3315.00Lakhs
Add To Inquiry Basket
Calcium Sennosides from Senna Leaves Production Business Plan
Calcium Sennosides from Senna Leaves Production Business Plan

Calcium Sennoside are the m... Read More

Capacity :
400 Kgs per Day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
607.00Lakhs
Add To Inquiry Basket
Manufacturing of Gum Arabic (Gum Acacia)
Manufacturing of Gum Arabic (Gum Acacia)

Gum Arabic, also referred to as gum acacia, may be a natural gum harvested from the o... Read More

Capacity :
Arabic Gum (Talha): 6.73 MT / Day
Plant and Machinery cost:
296.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
535.00Lakhs
Add To Inquiry Basket
Eco-Friendly Bamboo Based Products Manufacturing- Tissue Paper, Paper Bags & Plates
Eco-Friendly Bamboo Based Products Manufacturing- Tissue Paper, Paper Bags & Plates

 

Eco-Friendly Bamboo Ba... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Ideas in Production of Disposable IV Set
Business Ideas in Production of Disposable IV Set

 

Business Ideas in Production of Disposable I... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Phenolic Formaldehyde Resin
Production of Phenolic Formaldehyde Resin

 

Phenol formaldehyde resins (PF) or Phenolic resins are artificial polymers o... Read More

Capacity :
1,000 kg/day
Plant and Machinery cost:
34.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
144.00Lakhs
Add To Inquiry Basket
Production of Woven PP Cement Sacks
Production of Woven PP Cement Sacks

 

Woven polypropylene bags are ideal for transporting and packing bulk goods. Weaved polypropylene bags are th... Read More

Capacity :
PP Woven Sacks (for Cement Bag 50 Kgs Size):258000 Nos/ day PP Woven Jumboo Sacks (for Cement Bag 15
Plant and Machinery cost:
566.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
14.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
891.00Lakhs
Add To Inquiry Basket
Vitamin ‘C’ Manufacturing from Sorbitol
Vitamin ‘C’ Manufacturing from Sorbitol

 

Vitamin C is the simplest of the vitamins chemically, and as a result, it was one of the first to be extract... Read More

Capacity :
600 kg/day
Plant and Machinery cost:
371.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
717.00Lakhs
Add To Inquiry Basket
Start A Single Wall Steel Water Bottle Manufacturing Business
Start A Single Wall Steel Water Bottle Manufacturing Business

 

Water bottles come in a variety of shapes, colours, and sizes. A cord is attached to the stainless steel con... Read More

Capacity :
2,000 Nos/ day
Plant and Machinery cost:
138.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
439.00Lakhs
Add To Inquiry Basket
Invest in Linear Alkyl Benzene Sulphonic Acid (LABSA) manufacturing business
Invest in Linear Alkyl Benzene Sulphonic Acid (LABSA) manufacturing business

 

Introduction Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Weaving of Fiberglass Fabric for Composites (Using e Class Imported Yarns)
Weaving of Fiberglass Fabric for Composites (Using e Class Imported Yarns)

 

Introducti... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business opportunities in Maize Processing Unit (Starch, Glucose, Germs, Fibres, Gluten & Steep Water)
Business opportunities in Maize Processing Unit (Starch, Glucose, Germs, Fibres, Gluten & Steep Water)

A wide variety of agro-climatic conditions Maize is known a... Read More

Capacity :
Maize Starch: 30 MT per day Liquid Glucose: 30 MT per day Gluten: 4.50 MT per day Germs: 6 MT per d
Plant and Machinery cost:
3206.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
21.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
4496.00Lakhs
Add To Inquiry Basket
Emerging business opportunities in Production of Adhesive (Fevicol Type)
Emerging business opportunities in Production of Adhesive (Fevicol Type)

Cement, mucilage, glue, and paste are all terms that are fr... Read More

Capacity :
1.0 MT per Day
Plant and Machinery cost:
47.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
165.00Lakhs
Add To Inquiry Basket
Business Ideas and Investment Opportunities in Micronutrients Fertilizer Manufacturing Business
Business Ideas and Investment Opportunities in Micronutrients Fertilizer Manufacturing Business

 

Introducti... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Most Profitable Manufacturing Business of Phenolic Formaldehyde Resin PF Investment Opportunities in Resin Manufacturing Industry
Most Profitable Manufacturing Business of Phenolic Formaldehyde Resin PF Investment Opportunities in Resin Manufacturing Industry

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Best Manufacturing Business Ideas of Wine Production from Pineapple and Ginger
Best Manufacturing Business Ideas of Wine Production from Pineapple and Ginger

Introduction:

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Dal Mill, Split Pulses, Roasted Gram Split, Dal & Chana Manufacturing Plant A Profitable Business Idea to Start
Dal Mill, Split Pulses, Roasted Gram Split, Dal & Chana Manufacturing Plant A Profitable Business Idea to Start

 

Introducti... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start a Production Unit of Ply Board from Poplar & Eucalyptus Wooden Logs Emerging Opportunities in Wood Industry
Start a Production Unit of Ply Board from Poplar & Eucalyptus Wooden Logs Emerging Opportunities in Wood Industry

Introduction

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to Manufacture the English Willow Cricket Bats Business Plan and Investment Opportunity for Startups
How to Manufacture the English Willow Cricket Bats Business Plan and Investment Opportunity for Startups

Introduction... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Best Profitable Manufacturing and Processing Ideas of Poly Tetra Fluoro Ethylene PTFE Business
Best Profitable Manufacturing and Processing Ideas of Poly Tetra Fluoro Ethylene PTFE Business

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to set up a Chocolate Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange and Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)
How to set up a Chocolate Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange and Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)

 

Chocolate is a co... Read More

Capacity :
Milk Chocolate:1,600 Kgs Per Day Dark Chocolate:1,600 Kgs Per Day White Chocolate:1,600 Kgs Per Day
Plant and Machinery cost:
249.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
671.00Lakhs
Add To Inquiry Basket
Set up a Unit of Carbon Black Manufacturing Business
Set up a Unit of Carbon Black Manufacturing Business

 

Under regulated c... Read More

Capacity :
167 MT per day
Plant and Machinery cost:
2563.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
49.00%
Break Even Point (BEP):
25.00 %
TCI :
0.00 Lakhs
Cost of Project :
8249.00Lakhs
Add To Inquiry Basket
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles

 

Introduct... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start a Production Unit of Solar Photovoltaic (PV) Cell Solar Power in India is a Fast Developing Industry
Start a Production Unit of Solar Photovoltaic (PV) Cell Solar Power in India is a Fast Developing Industry

Introduction:... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Opportunities in Chemical Industry Manufacturing Business Startup of Silica Gel Crystal and Beads
Business Opportunities in Chemical Industry Manufacturing Business Startup of Silica Gel Crystal and Beads

Introduction:... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Set up an Manufacturing Unit of Chocolate and Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange & Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)
Set up an Manufacturing Unit of Chocolate and Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange & Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)

Chocolate is a general term... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
12345678910...

Showing 121 - 180 of 3004 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR